Container street permit in Lachine
To place a container on the street, sidewalk or alley in Lachine, a temporary occupancy permit is required. The borough does not publish the on-street surface rate online — check with it directly. In a private driveway, no permit is required.
How much does a container permit cost in Lachine?
A 20-yard container takes up about 16 m²: the “up to 49 m²” rate applies to nearly every residential rental.
- Minimum lead time
- 2 business days
- Maximum validity
- durée demandée
- Daily rate (up to 49 m²)
- Not published — verify with the borough
Note: Ne publie pas de tarif de surface sur rue ou trottoir — seulement arrière-trottoir, ruelle et surface non pavée. Exige une preuve d'assurance responsabilité de 2 M$. Traitement seulement après réception des documents et du paiement.
https://montreal.ca/demande-permis/occupation-temporaire-domaine-public/demande
This borough publishes amounts EXCLUDING tax: the total above is normalized tax-included (GST + QST, 14.975%).
What does the permit cost in comparable boroughs?
Boroughs with the same lead time, ranked by closest cost.
- Container permit in Anjou$430 for 10 days
- Container permit in L'Île-Bizard–Sainte-Geneviève$758 for 10 days
- Container permit in Mercier–Hochelaga-Maisonneuve$952 for 10 days
Which size for your project?
Data source: montreal.ca