Container street permit in Ahuntsic-Cartierville
Data verified on 19 July 2026 · source: montreal.ca
To place a container on the street, sidewalk or alley in Ahuntsic-Cartierville, a temporary occupancy permit is required. Expect about $848 tax included for 10 days (residential container, up to 49 m²). In a private driveway, no permit is required.
Cost estimator
A 20-yard container takes up about 16 m²: the “up to 49 m²” rate applies to nearly every residential rental.
- Minimum lead time
- 5 business days
- Maximum validity
- 1 mois
- Daily rate (up to 49 m²)
- $80.00 · tax incl.
- $80.00 × 10 days
- $800.00
- Issuance fee
- $48.00
- Subtotal · tax incl.
- $848.00
Note: Distingue explicitement particuliers et entrepreneurs. Délai porté à 10 jours ouvrables pour un chantier géré par un entrepreneur. Validité d'un mois seulement — la plus courte avec Anjou.
https://montreal.ca/demande-permis/occupation-temporaire-domaine-public/demande
The amounts published by this borough already include tax.
Data source: montreal.ca