Skip to content
Roulobac

Container street permit in Ahuntsic-Cartierville

· source: montreal.ca

To place a container on the street, sidewalk or alley in Ahuntsic-Cartierville, a temporary occupancy permit is required. Expect about $848 tax included for 10 days (residential container, up to 49 m²). In a private driveway, no permit is required.

How much does a container permit cost in Ahuntsic-Cartierville?

A 20-yard container takes up about 16 m²: the “up to 49 m²” rate applies to nearly every residential rental.

Minimum lead time
5 business days
Maximum validity
1 mois
Daily rate (up to 49 m²)
$80.00 · tax incl.
$80.00 × 10 days
$800.00
Issuance fee
$48.00
Subtotal · tax incl.
$848.00
Estimated total (tax incl.)
$848.00

Note: Distingue explicitement particuliers et entrepreneurs. Délai porté à 10 jours ouvrables pour un chantier géré par un entrepreneur. Validité d'un mois seulement — la plus courte avec Anjou.

https://montreal.ca/demande-permis/occupation-temporaire-domaine-public/demande

The amounts published by this borough already include tax.

What does the permit cost in comparable boroughs?

Boroughs with the same lead time, ranked by closest cost.

Which size for your project?

CallBook