Container street permit in Outremont
To place a container on the street, sidewalk or alley in Outremont, a temporary occupancy permit is required. Expect about $1025 tax included for 10 days (residential container, up to 49 m²). In a private driveway, no permit is required.
How much does a container permit cost in Outremont?
A 20-yard container takes up about 16 m²: the “up to 49 m²” rate applies to nearly every residential rental.
- Minimum lead time
- 5 business days
- Maximum validity
- 1 an
- Daily rate (up to 49 m²)
- $95.98 · tax incl.
- $95.98 × 10 days
- $959.80
- Issuance fee
- $65.52
- Subtotal · tax incl.
- $1025.32
Note: L'arrondissement le plus cher de l'île pour un conteneur résidentiel. Délai porté à 10 jours ouvrables pour un chantier géré par un entrepreneur. Le permis de déménagement, lui, est gratuit.
https://montreal.ca/demande-permis/occupation-temporaire-domaine-public/demande
The amounts published by this borough already include tax.
What does the permit cost in comparable boroughs?
Boroughs with the same lead time, ranked by closest cost.
- Container permit in Ahuntsic-Cartierville$848 for 10 days
- Container permit in Rivière-des-Prairies–Pointe-aux-Trembles$837 for 10 days
- Container permit in Côte-des-Neiges–Notre-Dame-de-Grâce$715 for 10 days
Which size for your project?
Data source: montreal.ca