Skip to content
Roulobac

Container street permit in Outremont

Data verified on 19 July 2026 · source: montreal.ca

To place a container on the street, sidewalk or alley in Outremont, a temporary occupancy permit is required. Expect about $1025 tax included for 10 days (residential container, up to 49 m²). In a private driveway, no permit is required.

Cost estimator

A 20-yard container takes up about 16 m²: the “up to 49 m²” rate applies to nearly every residential rental.

Minimum lead time
5 business days
Maximum validity
1 an
Daily rate (up to 49 m²)
$95.98 · tax incl.
$95.98 × 10 days
$959.80
Issuance fee
$65.52
Subtotal · tax incl.
$1025.32
Estimated total (tax incl.)
$1025.32

Note: L'arrondissement le plus cher de l'île pour un conteneur résidentiel. Délai porté à 10 jours ouvrables pour un chantier géré par un entrepreneur. Le permis de déménagement, lui, est gratuit.

https://montreal.ca/demande-permis/occupation-temporaire-domaine-public/demande

The amounts published by this borough already include tax.

CallBook