Container street permit in Le Sud-Ouest

Data verified on 19 July 2026 · source: montreal.ca

To place a container on the street, sidewalk or alley in Le Sud-Ouest, a temporary occupancy permit is required. Expect about $794 tax included for 10 days (residential container, up to 49 m²). In a private driveway, no permit is required.

Cost estimator

A 20-yard container takes up about 16 m²: the “up to 49 m²” rate applies to nearly every residential rental.

Minimum lead time
10 business days
Maximum validity
Not published — verify with the borough
Daily rate (up to 49 m²)
$74.00 · tax incl.
$74.00 × 10 days
$740.00
Issuance fee
$12.00
Analysis fee
$42.00
Subtotal · tax incl.
$794.00
Estimated total (tax incl.)
$794.00

Note: Prévoir 10 jours ouvrables d'analyse. Modification ou annulation acceptée seulement avant l'échéance du permis.

https://montreal.ca/demande-permis/occupation-temporaire-domaine-public/demande

The amounts published by this borough already include tax.