Skip to content
Roulobac

Container street permit in Ville-Marie

Data verified on 19 July 2026 · source: montreal.ca

To place a container on the street, sidewalk or alley in Ville-Marie, a temporary occupancy permit is required. Expect about $705 tax included for 10 days (residential container, up to 49 m²). In a private driveway, no permit is required.

Cost estimator

A 20-yard container takes up about 16 m²: the “up to 49 m²” rate applies to nearly every residential rental.

Minimum lead time
10 business days
Maximum validity
1 an
Daily rate (up to 49 m²)
$65.00 · tax incl.
$65.00 × 10 days
$650.00
Issuance fee
$17.32
Analysis fee
$38.00
Subtotal · tax incl.
$705.32
Estimated total (tax incl.)
$705.32

Note: Demande à faire au minimum 10 jours ouvrables à l'avance. Forte densité de parcomètres au centre-ville : prévoir les frais de capuchonnage et de perte de revenus, souvent plus lourds que le permis lui-même.

https://montreal.ca/demande-permis/occupation-temporaire-domaine-public/demande

The amounts published by this borough already include tax.

CallBook