Container street permit in Verdun

Data verified on 19 July 2026 · source: montreal.ca

To place a container on the street, sidewalk or alley in Verdun, a temporary occupancy permit is required. The borough does not publish the on-street surface rate online — check with it directly. In a private driveway, no permit is required.

Cost estimator

A 20-yard container takes up about 16 m²: the “up to 49 m²” rate applies to nearly every residential rental.

Minimum lead time
2 business days
Maximum validity
1 an
Daily rate (up to 49 m²)
Not published — verify with the borough
Not published — verify with the borough. Verdun — montreal.ca

Note: TARIFS NON PUBLIÉS EN HTML — renvoi à un PDF « Grille tarifaire 2026 ». À extraire manuellement avant publication. Quand un entrepreneur exécute les travaux, l'arrondissement exige que ce soit lui, et non son client, qui demande le permis. Bureaux fermés à 12 h 30 le vendredi : pour des travaux le lundi, demander au plus tard le mercredi précédent. Demande exclusivement en ligne.

https://montreal.ca/demande-permis/occupation-temporaire-domaine-public/demande

The amounts published by this borough already include tax.