Skip to content
Roulobac

Container street permit in Verdun

· source: montreal.ca

To place a container on the street, sidewalk or alley in Verdun, a temporary occupancy permit is required. The borough does not publish the on-street surface rate online — check with it directly. In a private driveway, no permit is required.

How much does a container permit cost in Verdun?

A 20-yard container takes up about 16 m²: the “up to 49 m²” rate applies to nearly every residential rental.

Minimum lead time
2 business days
Maximum validity
1 an
Daily rate (up to 49 m²)
Not published — verify with the borough
Not published — verify with the borough. Verdun — montreal.ca

Note: TARIFS NON PUBLIÉS EN HTML — renvoi à un PDF « Grille tarifaire 2026 ». À extraire manuellement avant publication. Quand un entrepreneur exécute les travaux, l'arrondissement exige que ce soit lui, et non son client, qui demande le permis. Bureaux fermés à 12 h 30 le vendredi : pour des travaux le lundi, demander au plus tard le mercredi précédent. Demande exclusivement en ligne.

https://montreal.ca/demande-permis/occupation-temporaire-domaine-public/demande

The amounts published by this borough already include tax.

What does the permit cost in comparable boroughs?

Boroughs with the same lead time, ranked by closest cost.

Which size for your project?

CallBook